vertequip

19 Aug, 2016

The Kilamba building is one of the highest and emblematic buildings in the Marginal of Luanda, Angola.
Completed in 2016, its architecture with glass facades and a slender configuration with over 100 meters of height, requires careful maintenance and regular cleaning. The STEP solution, light and simple, allows for use with scaffolding baskets or motorised abseiling for simpler jobs.

The STEP 4TWO system installed is a motorised system that runs in a monorail surrounding the building and allowing access to all the facades a simple and secure way.

20 Oct, 2015

On the 16th September Vertequip’s Patent on the S.T.E.P. system was published, reinforcing the progress that underlies our technology and solutions.

S.T.E.P. has received several international awards www.vertequip.com/prizes and is continuously recognized by the technological advances that it brings into the activities of works at heights.

The patent took over 3 years since its submission to the granted status and its publication, having passed extensive processes of technical selection and investigation.

09 Apr, 2014

Technical data:

Perimeter: 100m

Height: 45m

Curves: 2 curves of 90 degrees

S.T.E.P. Model: No Limits

Electrical supply: Three-phase

Building Surface: Glass and Alucobond

 

 

ZON OPTIMUS, the biggest telecommunications and entertainment group in Portugal, has installed STEP in one of its OPTIMUS buildings, based in Porto. The investment allowed a reduction of 50% of its cleaning costs while adding a simple way to access any point of the facade within a few seconds.

 

27 Oct, 2013

"S.T.E.P." was presented at the biggest event oriented to the Construction sector, Public Works, Planning, Architecture and Building Materials in Angola - Projeckta 2013.

 

Located in FIL - Luanda, the 11th edition of Projekta from 24-27th October 2013, which motto was "Projecting the Future, Building the present", had 380 exhibitors in an area of ​​15,000 m². Vertequip attended with our distributor NBK who represents "S.T.E.P." in Angola.

 

At the gala ceremony, Projekta distinguished "S.T.E.P." at the BEST PRODUCT INNOVATION.

21 Sep, 2013

On the 21st of September 2013 Vertequip inaugurated its Factory in Chamusca, Portugal.

 

With the help of 600k € in funding from the Governmental program QREN, the factory has been ready earlier then expected. The works carried out for several months endowed the facilities with 2 small pavilions of 2 floors each, an office space, a warehouse for finished products and a training room for the S.T.E.P Academy.

 

The factory is equipped with modern machines capable of manufacturing and produce the parts and accessories of the S.T.E.P.

 

Subscribe to RSS - vertequip